Montana's Timber Frame & SIP Specialists
FREE EstimatesIn-House DraftingCustom Home Construction
SIPs / High Performance Homes
Tamarack Construction specializes in building with Structural Insulated Panels (SIPs)—a modern building system designed for strength, efficiency, and long-term performance. SIPs create a tightly sealed building envelope that delivers superior insulation, reduces air leakage, and improves overall energy efficiency.
When combined with our timber frame expertise, SIPs allow us to build homes that offer the warmth and beauty of exposed timber craftsmanship with the comfort, durability, and performance of a high-efficiency home. The result is faster build times, lower energy costs, and a stronger, quieter home built to handle Montana’s toughest seasons for years to come.


Timber Frames
Custom Homes
Our goal is to make the building process a positive experience for each client and to create a home of lasting value that enhances their living environment and optimizes their investment. Give us a call today! 406-777-7164
Testimonial From Mr and Mrs Churchill: My wife and I could not be more pleased than we are with our new home built by Tamarack Construction Company. Working with Paul and his crew was a real pleasure. They made the challenges of building easy to face. Although we have built several homes, we had never used SIPs until now. We will build all of our future homes with them. With the SIPs, our home is absolutely plumb, airtight, and energy-efficient. Thanks, Tamarack!!!

OUR PROCESS
A Proven Process. A Better Build.
Building a custom home is a major investment. Our process is designed to be clear, organized, and enjoyable—giving you confidence every step of the way.


Build With Confidence
At Tamarack Construction, we believe the process matters just as much as the finished product. From the first meeting to the final walkthrough, our goal is to build something lasting—with craftsmanship you can trust.